New infrastructure projects targeting road connectivity, healthcare access and agricultural development are being rolled out across the North Bank and Central River Region North as part of the government’s ongoing nationwide development programme.

The projects, launched and inaugurated during President Adama Barrow’s development tour on Monday, August 10, include new road projects, health posts, an ambulance and an agro logistics centre intended to improve the movement of people and agricultural produce and bring basic services closer to communities.

The activities formed part of Phase II of the Connect Gambia Infrastructure Project and the President’s nationwide development tour, which runs from August 8 to 19.

The day’s programme began with the laying of the foundation stone for the 17.3km Jumansaraba–Alkali Kunda–Yalal Tokonjala road project.

The project is expected to improve road connectivity between communities along the route and facilitate the movement of people and goods.

President Barrow later visited the GIRAV Agro-Logistics Centre at Maka Farafenni, where he was briefed on the progress of the facility being constructed under the Gambia Inclusive and Resilient Agricultural Value Chain Development Project.

Agriculture Minister Demba Sabally said the centre is expected to help address post-harvest losses while improving the storage, handling and distribution of agricultural produce.

The facility is being financed by the World Bank and the Government of The Gambia at a cost of US$3.2 million.

The centre will include dry warehouses, cold-storage facilities, sorting and grading areas, logistics facilities, a weighbridge and industrial plots.

The cold storage facilities are intended to accommodate perishable agricultural produce, while the dry warehouses will provide storage for commodities including onions and other produce from the region.

Minister Sabally said post harvest losses are estimated at about 30%, particularly for perishable goods, and that the centre is expected to help reduce these losses by providing farmers with improved facilities to store and preserve their produce.

He linked the project to the country’s objective of achieving food self sufficiency by 2030, saying improved storage, handling and distribution would strengthen agricultural value chains and reduce losses between production and consumption.

The agro logistics centre will also include a sewage treatment plant, waste management centre, electrical distribution system, internal road network and drainage infrastructure.

Other planned facilities include commercial spaces and shops, training centres, a bank, food outlets and security facilities.

Mamut Jagne, Director General of the Central Project Coordinating Unit at the Ministry of Agriculture, said construction of the facility is currently about 75% complete.

He said the administration building is expected to be completed by October, provided construction is not significantly affected by the rains.

According to Jagne, tiling on the upper floor is about 90 percent complete, while work in the middle section is around 70% complete.

He said the materials required to complete the project have already been mobilised and are on site, with four to five teams working simultaneously on different sections of the facility.

The main warehouse is expected to have a storage capacity of approximately 2,700 metric tonnes.

Jagne said the administration building will house stores, shops, a training centre and a dormitory.

The centre will also include a fuel station and a repair workshop, with plans to engage private concessionaires to operate the fuel station.

The project is expected to be completed by the end of October, with a possible inauguration in the first week of November.

From Maka Farafenni, the development tour continued to Ngayen Sanjal, where President Barrow laid the foundation stone for Lot 7 of the North Bank road projects.

The Ngayen Sanjal project covers approximately 52 kilometres and is intended to improve connectivity within the Sanjal District and surrounding communities.

Speaking later in Njau, President Barrow said the road project should be viewed as more than a physical infrastructure investment, arguing that improved connectivity would provide better links between farmers and markets, children and schools, and communities and healthcare services.

He said the project would also help unlock the agricultural potential of Sanjal and surrounding communities.

The President then inaugurated the 12km Njau Loop road, a newly completed all-weather road.

He said the completion of the road would ease movement and improve access to services and economic opportunities for residents of Njau and surrounding communities.

Barrow also highlighted the importance of road infrastructure to agricultural production in the Central River Region North, which he described as a major food producing area.

He said investment in roads in the region would help farmers access markets, strengthen food distribution, create employment opportunities and support investment in agribusiness and other industries.

The President called on the National Roads Authority and contractors to maintain the standard of work demonstrated on the Njau Loop project as construction continues on the Ngayen Sanjal road and other projects.

He also urged residents to protect the infrastructure, stressing that the maintenance of public projects requires cooperation between government and communities.

“Development is not a government affair alone,” he said, calling on citizens to play their part in protecting public infrastructure.

The development programme also included investments in healthcare.

At Balangharr Jaloto, President Barrow inaugurated a health post and handed over an ambulance to the community. He later inaugurated another health post at Buduck.

Health Minister Dr Ahmadou Lamin Samateh said expanding health infrastructure was part of the government’s objective of ensuring that communities have access to basic healthcare services.

President Barrow said the establishment of health posts in remote communities was intended to reduce the distance residents have to travel to access healthcare.

He said the government was working to bring basic health services closer to communities that previously had limited access to health facilities.

The projects launched and inaugurated during the day therefore covered three key areas of development: road connectivity, agricultural infrastructure and healthcare access.

The road projects are intended to improve the movement of people and goods, while the agro-logistics centre is designed to strengthen storage and distribution within the agricultural value chain. The health posts and ambulance are aimed at improving access to basic healthcare services in communities.